Scaffold Inspection Checklist (Free Excel Template)
A scaffold inspection checklist for the competent person to use before each work shift and after erection, a change, or a storm. It comes with two extra sheets for rolling scaffold towers and system scaffolds, each with what to look for on every line.
Excel (.xlsx) · 10 sheets · Updated 2026-10-21
Enter your company name, name, and business email, and we will email you the download link.
Who is this scaffold inspection checklist for?
- Competent persons and foremen who inspect scaffolds on construction sites
- General contractors who want one record for every scaffold on the job
- Maintenance and facility teams that use rolling scaffold towers indoors
When to use it
Fill in the Scaffold Inspection sheet before each work shift, after the scaffold is erected or changed, and after high wind, heavy rain or snow, an earthquake, or anything else that could affect it. Use the Rolling Scaffold sheet after assembly, after each move, and before work each day. Use the System Scaffold sheet for wedge or rosette systems. One sheet per inspection.
What's included
The template includes the following. Delete anything you do not need.
- Site, date, inspection type, and competent person in the header
- Scaffold Inspection: 32 items in 7 areas (foundation, connections, ties and bracing, platforms, fall protection, access, falling objects and loads)
- Inspection type drop-down on every line: before shift, after erection or change, after storm or event, or all
- Defect record and summary: what was found, whether the area was closed, the fix, and who checked it
- Rolling Scaffold: 37 items in 7 groups, including caster brakes and checks each time the tower is moved
- System Scaffold: 22 items, from the before-shift check to wedge connections and mixed systems
- Filled-in sample sheets and print layouts for US Letter
Preview the Excel file
This is the actual file. Use the tabs below to switch between the 10 sheets. How to mark each result is explained on the "Instructions" sheet.
| A | |
|---|---|
| 1 | Scaffold Inspection Checklist (Before Each Shift and After Changes) |
| 2 | |
| 3 | ■ Source |
| 4 | Worker Library https://worker-library.com/templates/scaffold-inspection-checklist/ |
| 5 | Request a template or an extra item: https://worker-library.com/contact/ |
| 6 | |
| 7 | ■ Sheets in this workbook |
| 8 | "Scaffold Inspection" … Frame, tube-and-clamp, or system scaffold. One sheet per inspection: before each shift, after erection or a change, and after a storm or other event. 32 items in 7 areas. |
| 9 | "Rolling Scaffold" … Rolling (mobile) scaffold towers on casters. 37 items with what to look for. Use it after assembly, after each move, and before work each day. |
| 10 | "System Scaffold" … System scaffold with wedge or rosette connections. 22 items with what to look for: the before-shift check, the check after erection, a change, or a storm, records, and items specific to system scaffolds. |
| 11 | "Sample - Scaffold" … A filled-in example of the "Scaffold Inspection" sheet. |
| 12 | "Sample - Rolling" … A filled-in example of the "Rolling Scaffold" sheet. |
| 13 | "Sample - System" … A filled-in example of the "System Scaffold" sheet. |
| 14 | "Print - Scaffold" … "Scaffold Inspection" laid out for printing and filling in by hand (US Letter, column headings repeat on every page). |
| 15 | "Print - Rolling" … "Rolling Scaffold" laid out for printing and filling in by hand (US Letter, column headings repeat on every page). |
| 16 | "Print - System" … "System Scaffold" laid out for printing and filling in by hand (US Letter, column headings repeat on every page). |
| 17 | |
| 18 | ■ How to use |
| 19 | 1. Fill in the site, date, inspection type, and the competent person's name. |
| 20 | 2. Walk the scaffold from the base up and mark Pass, Fail, or N/A on each line. |
| 21 | 3. If any line is Fail, close that part of the scaffold, put a "Do Not Use" tag on it, and write the defect and fix in the defect record. |
| 22 | 4. Before the scaffold is used again, the competent person checks the fix and signs the re-check. |
| 23 | 5. Keep each sheet with the job file. Start a new sheet for every inspection. |
| 24 | |
| 25 | ■ How to mark results, and what to do (read before you start) |
| 26 | Pass … OK to use. |
| 27 | Fail … Stop using it on the spot and tag it "Do Not Use" or barricade the area. Tell your supervisor and write the corrective action. |
| 28 | N/A … The item does not exist here or does not apply today. Do not leave it blank. A blank cell means "not checked". |
| 29 | The inspector may decide to stop. Nobody is blamed for stopping. If in doubt, mark Fail. |
| 30 | After the corrective action, do not return it to service until the verifier writes the re-check date and name. |
| 31 | |
| 32 | ■ Adapting it to your site |
| 33 | • Delete lines that do not apply, such as suspended scaffold parts or debris netting. |
| 34 | • Add lines from the scaffold manufacturer's manual, such as bracket loads, hoist arms, or a specific tie pattern. |
| 35 | • If you use a green / yellow / red tag system, write the tag color in the summary. |
| 36 | |
| 37 | ■ Things to watch |
| 38 | • OSHA 29 CFR 1926.451(f)(3) asks for scaffolds and components to be inspected for visible defects by a competent person before each work shift and after any occurrence that could affect structural integrity. This template is a way to record that; it is not an official form. |
| 39 | • Heights, spacing, and load limits differ by scaffold type. Follow the manufacturer's manual and erection drawing, and the rules that apply to your scaffold. |
| 40 | • Do not use a scaffold with a Fail line until it is fixed and the competent person has checked it again. |
| 41 | • State plans may add requirements. Check the current rules that apply to your site. |
| 42 | |
| 43 | ■ About this template |
| 44 | A free inspection template from Worker Library. |
| 45 | You may copy, edit, and print it for use in your own organization. Add or delete items as you need. |
| 46 | Please do not redistribute or sell the template itself. |
| 47 | |
| 48 | ■ Important notice |
| 49 | This template organizes common inspection items for reference. It is not an official form issued by OSHA or any other authority, and using it does not by itself show compliance. |
| 50 | Which inspections are required, how often, and how long records must be kept depend on the equipment, industry, size of the operation, and location (federal, state, and local rules can all apply). |
| 51 | Check the regulations and standards that apply to you, the manufacturer's instructions, and a qualified or competent person. |
| 52 | Worker Library accepts no liability for any loss arising from the use of this template. |
| 53 | Regulations change. Check the source page above for the latest version. |
| 54 | |
| 55 | ■ Related regulations and standards (for reference) |
| 56 | OSHA 29 CFR 1926.451(f)(3): scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity. Check the current rule and the scaffold manufacturer's instructions. |
| 57 | |
| 58 | ■ Updated |
| 59 | 2026-10-21 (reviewed every 3 months) |
| 60 | |
| 61 | ■ About Worker Library |
| 62 | Worker Library publishes free Excel inspection checklists, logs, and forms for maintenance, safety, and quality teams. |
| 63 | All templates: https://worker-library.com/templates/ |
| A | B | C | D | E | F | |
|---|---|---|---|---|---|---|
| 1 | Scaffold Inspection Checklist (Before Each Shift and After Changes) | |||||
| 2 | Site | Date | ||||
| 3 | Inspection type | Competent person | ||||
| 4 | ||||||
| 5 | No. | Area | Inspection item | Inspection type | Result | Defect found / corrective action |
| 6 | 1 | Foundation and base | Mudsills and base plates firmly set, with no settling or gaps | |||
| 7 | 2 | Screw jacks and legs are not sliding or shifting | ||||
| 8 | 3 | Base ties (sweeper tubes) installed securely | ||||
| 9 | 4 | Ground has no washout or soft spots | ||||
| 10 | 5 | Connections | Post (leg) joints connected securely | |||
| 11 | 6 | Clamps and couplers are not loose or damaged | ||||
| 12 | 7 | Ledger and bearer connections have no play | ||||
| 13 | 8 | Wedges and pins fully inserted | ||||
| 14 | 9 | Ties and bracing | Wall ties installed at the required spacing | |||
| 15 | 10 | Wall ties undamaged, none removed | ||||
| 16 | 11 | Cross braces and diagonal braces installed | ||||
| 17 | 12 | Tie anchor points on the building are not loose or broken | ||||
| 18 | 13 | Platforms | Platforms fully planked; width and gaps within the scaffold's requirements | |||
| 19 | 14 | Planks secured so they cannot kick up or slide | ||||
| 20 | 15 | Planks have no damage or major deflection | ||||
| 21 | 16 | No unneeded materials or tools left on platforms | ||||
| 22 | 17 | Fall protection | Top rails installed on all open sides at the required height | |||
| 23 | 18 | Midrails and toeboards installed | ||||
| 24 | 19 | End guardrails and toeboards at the scaffold ends | ||||
| 25 | 20 | Advance guardrail parts (if used) installed correctly | ||||
| 26 | 21 | Openings and access points covered or guarded | ||||
| 27 | 22 | Access and walkways | Stairs and ladders secured | |||
| 28 | 23 | Guardrails around the access opening | ||||
| 29 | 24 | Walkways clear of obstructions and protruding objects | ||||
| 30 | 25 | Lighting is adequate | ||||
| 31 | 26 | Workers do not climb cross braces to get on or off | ||||
| 32 | 27 | Falling objects, loads, and other | Debris netting and catch platforms secured | |||
| 33 | 28 | Toeboards and netting have no tears or loose sections | ||||
| 34 | 29 | Ramps and walkways: slope and cleats are adequate | ||||
| 35 | 30 | Maximum intended load posted or known to users | ||||
| 36 | 31 | Overhead power lines: clearance kept or lines guarded | ||||
| 37 | 32 | Scaffold status tag (for example green / yellow / red) in place and up to date | ||||
| 38 | 33 | |||||
| 39 | 34 | |||||
| 40 | 35 | |||||
| 41 | ||||||
| 42 | Defect record (fill in every time you mark a defect. Fill left to right in the order things happened. "Condition found" is written by the person who found it, "Corrective action" by the person who fixed it, "Verified by" by the person who checked it.) | |||||
| 43 | Date / condition found | Stopped? / reported to / action | Verified by / returned to service | |||
| 44 | ||||||
| 45 | ||||||
| 46 | ||||||
| 47 | ||||||
| 48 | Summary (what must be done before the next inspection, due date, person responsible) | |||||
| 49 | ||||||
| 50 | ||||||
| 51 | ||||||
| 52 | Inspected by | Reviewed by (supervisor) | Approved by (manager) | |||
| 53 | ||||||
| 54 | ||||||
| 55 | Notice: This is a general-purpose inspection record. It is not an official government form and does not by itself show compliance with OSHA or any other regulation or standard. | |||||
| 56 | Related regulations and standards (for reference): OSHA 29 CFR 1926.451(f)(3): scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity. Check the current rule and the scaffold manufacturer's instructions. | |||||
| 57 | Which inspections you need, how often, and how long to keep records depend on your equipment, industry, and location. Check the regulations that apply to you, the manufacturer's instructions, and a qualified person. | |||||
| 58 | Worker Library accepts no liability for any loss arising from the use of this template. Regulations change; check the source page for the latest version. | |||||
| 59 | Worker Library https://worker-library.com/templates/scaffold-inspection-checklist/ Updated 2026-10-21 | |||||
| A | B | C | D | E | F | |
|---|---|---|---|---|---|---|
| 1 | Scaffold Inspection Checklist (Before Each Shift and After Changes) | |||||
| 2 | Site | Scaffold ID | ||||
| 3 | Inspection type | Date | ||||
| 4 | Platform height / base | Inspected by | ||||
| 5 | ||||||
| 6 | No. | Area | Inspection item | What to look for | Method | Result |
| 7 | 1. Height and stability (tip-over risk: do not use until these are right) | |||||
| 8 | 1 | Stability | Platform height and base width are within the limit | Within the manufacturer's height-to-base limit. If not, add outriggers, ties, or guys as the manufacturer specifies | Measure | |
| 9 | 2 | Outriggers (if used) are the right size | Outrigger height not less than its width, or as the manufacturer specifies | Visual / measure | ||
| 10 | 3 | Outriggers have a jack where the diagonal and horizontal members meet | Jack in place and adjusted to the floor | Visual | ||
| 11 | 4 | Tall towers have an intermediate horizontal frame | Horizontal frame between the casters and the platform when the tower is tall for its base (per manufacturer) | Visual | ||
| 12 | 2. Platform | |||||
| 13 | 5 | Platform | Platform deck has uplift-preventing hooks at all four corners | Hooks at all four corners, engaged | Visual | |
| 14 | 6 | Planks (if used) are laid tight and secured | Full width, no wide gaps, secured to the supports | Visual | ||
| 15 | 7 | Platform has no damage, deformation, or kick-up | Do not use damaged or deformed parts | Visual | ||
| 16 | 3. Frames and bracing | |||||
| 17 | 8 | Frames | Frame coupling pins are inserted far enough | Coupling pins fully inserted with locks engaged (length per manufacturer) | Visual / hand | |
| 18 | 9 | Cross brace pins are the right size and lock | Brace pins with locks, size per manufacturer | Visual | ||
| 19 | 10 | Horizontal bracing or ties at the bottom of the tower | Horizontal cross bracing or ties at the base | Visual | ||
| 20 | 11 | Ties have clamps at both ends | Clamps at both ends grip firmly | Visual / hand | ||
| 21 | 12 | Horizontal frames have uplift-preventing hooks at both ends | Hooks engaged at both ends | Visual | ||
| 22 | 4. Casters | |||||
| 23 | 13 | Casters | Casters are the right size | Caster size and rating per manufacturer for the load | Visual | |
| 24 | 14 | Caster brakes are fitted and hold | Each brake locks the wheel; the tower does not move when pushed | Operate | ||
| 25 | 15 | Caster stems cannot come out of the legs | Stem locked to the leg, does not pull out | Visual / hand | ||
| 26 | 5. Access and guardrails | |||||
| 27 | 16 | Access / guards | [Ladder] Rungs are the right length and evenly spaced | Built-in or attached ladder per manufacturer; rungs evenly spaced | Visual | |
| 28 | 17 | [Stairs] Slope and width are adequate | Per manufacturer | Visual | ||
| 29 | 18 | Guardrails, midrails, and toeboards around the platform | Top rail and midrail on all open sides; toeboards where tools or materials could fall | Visual | ||
| 30 | 6. Use | |||||
| 31 | 19 | Use | Maximum load is set and posted | Rated load per manufacturer, posted where users can see it | Visual | |
| 32 | 20 | Frame joints are locked so they cannot separate in use | All joints locked | Visual / hand | ||
| 33 | 21 | Two or more towers are joined securely | Joined with tube and clamps or the manufacturer's parts | Visual | ||
| 34 | 22 | Caster brakes are set and checked | Brakes on at all times except while moving. Check that they hold | Operate | ||
| 35 | 23 | Platform is level on uneven or sloped floors | Leveled with screw jacks | Visual / level | ||
| 36 | 24 | Outriggers set: mounting and floor contact OK | Secure, in full contact with the floor | Visual | ||
| 37 | 25 | Ties or guys used when tarps or sheeting could catch wind | Ties or guys installed | Visual | ||
| 38 | 26 | Not set up near overhead power lines, or lines guarded | Lines moved or covered, or clearance kept | Visual | ||
| 39 | 27 | Load is not over the maximum and not off-center | Within the rated load; materials placed so the tower does not tip | Visual | ||
| 40 | 28 | No ladders or stepladders used on the platform | Do not use ladders on the platform | Visual | ||
| 41 | 29 | Guardrails removed for work or access are put back | Put back as soon as they are no longer needed | Visual | ||
| 42 | 7. Moving the tower (check each time it is moved) | |||||
| 43 | 30 | Moving | Floor checked for bumps, holes, and obstacles before moving | Route checked first | Visual | |
| 44 | 31 | All caster brakes released before moving | All brakes released | Operate | ||
| 45 | 32 | No one on the scaffold while it is moved | Never move it with people on it | Visual | ||
| 46 | 33 | Area around the move kept clear | Only the crew moving it in the area | Visual | ||
| 47 | 34 | All outrigger jacks raised before moving | All jacks raised | Visual | ||
| 48 | 35 | Tower lowered first if it could tip | Reduce the height so it cannot tip | Visual | ||
| 49 | 36 | Outriggers removed or folded if they could hit the building or equipment | Removed or folded | Visual | ||
| 50 | 37 | Towers that were tied: tip-over prevented when moving | Lower the tower or remove sheeting before moving | Visual | ||
| 51 | 38 | |||||
| 52 | 39 | |||||
| 53 | 40 | |||||
| 54 | 41 | |||||
| 55 | ||||||
| 56 | Inspected by (name) | Competent person / foreman | Reviewed by | |||
| 57 | ||||||
| 58 | ||||||
| 59 | Summary (items not corrected on the spot, work areas stopped, what to check next) | |||||
| 60 | ||||||
| 61 | ||||||
| 62 | ||||||
| 63 | ||||||
| 64 | Notice: This is a general-purpose inspection record. It is not an official government form and does not by itself show compliance with OSHA or any other regulation or standard. | |||||
| 65 | Related regulations and standards (for reference): OSHA 29 CFR 1926.451(f)(3): scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity. Check the current rule and the scaffold manufacturer's instructions. | |||||
| 66 | Which inspections you need, how often, and how long to keep records depend on your equipment, industry, and location. Check the regulations that apply to you, the manufacturer's instructions, and a qualified person. | |||||
| 67 | Worker Library accepts no liability for any loss arising from the use of this template. Regulations change; check the source page for the latest version. | |||||
| 68 | Worker Library https://worker-library.com/templates/scaffold-inspection-checklist/ Updated 2026-10-21 | |||||
This preview shows the first 6 of 8 columns. The downloaded file contains everything.
| A | B | C | D | E | F | |
|---|---|---|---|---|---|---|
| 1 | Scaffold Inspection Checklist (Before Each Shift and After Changes) | |||||
| 2 | Site | Scaffold | ||||
| 3 | Inspection type | Date | ||||
| 4 | Competent person | Maximum load | ||||
| 5 | ||||||
| 6 | No. | Area | Inspection item | What to look for | Method | Result |
| 7 | 1. Before each work shift | |||||
| 8 | 1 | Before shift | Guardrails, midrails, toeboards, and cross braces at the work area: none removed or fallen | All in place | Visual | |
| 9 | 2 | A competent person is assigned to inspect | Name written in the header | Record | ||
| 10 | 2. After erection, a change, a storm, or an earthquake | |||||
| 11 | 3 | After events | Platforms: damage, fastening, and bearing | Full width planked, no wide gaps, planks rest on and are secured to at least two supports | Visual | |
| 12 | 4 | Wedge connections at posts, ledgers, and bearers: not loose | Wedges driven to the set position, not lifting; locking pins in | Visual / hammer | ||
| 13 | 5 | Wedges and rosettes (or cups): damage and corrosion | No bent, cracked, crushed, or heavily corroded parts | Visual | ||
| 14 | 6 | Guardrails and midrails: removed or fallen | Top rail and midrail at the heights in the manufacturer's manual and the rules that apply | Visual / measure | ||
| 15 | 7 | Toeboards: installed, none removed | Toeboard, debris net, or equal protection in place | Visual | ||
| 16 | 8 | Legs: settling or sliding | Base plates on mudsills; base ties installed | Visual | ||
| 17 | 9 | Braces, ties, and wall ties: installed, none removed | Tie spacing per the manufacturer's manual and the erection drawing | Visual | ||
| 18 | 10 | Posts, ledgers, and bearers: damage | Remove bent, dented, cracked, or heavily corroded members | Visual | ||
| 19 | 11 | Suspended scaffold parts (if used with it): outrigger beams, ropes, and hoist pawls | Only if a suspended scaffold is used with it. Otherwise mark N/A | Visual / operate | ||
| 20 | 3. Records | |||||
| 21 | 12 | Records | Inspection result and the inspector's name written down | This sheet is the record. Always write the name | Record | |
| 22 | 13 | Corrective action written down | Write what was fixed and how, not just "fixed" | Record | ||
| 23 | 14 | Records kept until the job ends | Keep with the job file for the length of the job (company practice) | Record | ||
| 24 | 4. System scaffold items | |||||
| 25 | 15 | System | Wedges fully driven | Wedge head at the set position. Check by hand | Visual / hand | |
| 26 | 16 | Post connections have locking pins | All locking pins required by the manufacturer in place | Visual | ||
| 27 | 17 | No mixing of brands or connection systems | Different systems do not fit. Do not mix | Visual | ||
| 28 | 18 | Advance guardrail parts used in the right order during erection and dismantling | Follow the manufacturer's erection sequence | Visual | ||
| 29 | 19 | Stairs or ladders secured; access openings guarded | Hatch or gate at the access opening works | Visual | ||
| 30 | 20 | Maximum load set, posted, and known to workers | Rated load per manufacturer, posted where users can see it | Visual | ||
| 31 | 21 | Overhead power lines: guarded or clear | Lines moved or covered, or clearance kept | Visual | ||
| 32 | 22 | Erection crew led by a competent person | Checks materials, tools, and PPE, sets the work method, and watches the work | Record | ||
| 33 | 23 | |||||
| 34 | 24 | |||||
| 35 | 25 | |||||
| 36 | 26 | |||||
| 37 | ||||||
| 38 | Inspected by (name) | Competent person / foreman | Reviewed by | |||
| 39 | ||||||
| 40 | ||||||
| 41 | Summary (items not corrected on the spot, work areas stopped, what to check next) | |||||
| 42 | ||||||
| 43 | ||||||
| 44 | ||||||
| 45 | ||||||
| 46 | Notice: This is a general-purpose inspection record. It is not an official government form and does not by itself show compliance with OSHA or any other regulation or standard. | |||||
| 47 | Related regulations and standards (for reference): OSHA 29 CFR 1926.451(f)(3): scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity. Check the current rule and the scaffold manufacturer's instructions. | |||||
| 48 | Which inspections you need, how often, and how long to keep records depend on your equipment, industry, and location. Check the regulations that apply to you, the manufacturer's instructions, and a qualified person. | |||||
| 49 | Worker Library accepts no liability for any loss arising from the use of this template. Regulations change; check the source page for the latest version. | |||||
| 50 | Worker Library https://worker-library.com/templates/scaffold-inspection-checklist/ Updated 2026-10-21 | |||||
This preview shows the first 6 of 8 columns. The downloaded file contains everything.
| A | B | C | D | E | F | |
|---|---|---|---|---|---|---|
| 1 | Scaffold Inspection Checklist (Before Each Shift and After Changes) [SAMPLE] | |||||
| 2 | Site | Site 4, Building B | Date | 08/05/2026 | ||
| 3 | Inspection type | After erection or change | Competent person | J. Davis | ||
| 4 | ||||||
| 5 | No. | Area | Inspection item | Inspection type | Result | Defect found / corrective action |
| 6 | 1 | Foundation and base | Mudsills and base plates firmly set, with no settling or gaps | Pass | ||
| 7 | 2 | Screw jacks and legs are not sliding or shifting | Pass | |||
| 8 | 3 | Base ties (sweeper tubes) installed securely | Fail | East side, level 1: one sweeper tube clamp loose. Tightened on the spot and checked again before use. | ||
| 9 | 4 | Ground has no washout or soft spots | Pass | |||
| 10 | 5 | Connections | Post (leg) joints connected securely | Pass | ||
| 11 | 6 | Clamps and couplers are not loose or damaged | Pass | |||
| 12 | 7 | Ledger and bearer connections have no play | Pass | |||
| 13 | 8 | Wedges and pins fully inserted | Pass | |||
| 14 | 9 | Ties and bracing | Wall ties installed at the required spacing | Pass | ||
| 15 | 10 | Wall ties undamaged, none removed | Pass | |||
| 16 | 11 | Cross braces and diagonal braces installed | Pass | |||
| 17 | 12 | Tie anchor points on the building are not loose or broken | Pass | |||
| 18 | 13 | Platforms | Platforms fully planked; width and gaps within the scaffold's requirements | Pass | ||
| 19 | 14 | Planks secured so they cannot kick up or slide | Pass | |||
| 20 | 15 | Planks have no damage or major deflection | Pass | |||
| 21 | 16 | No unneeded materials or tools left on platforms | Pass | |||
| 22 | 17 | Fall protection | Top rails installed on all open sides at the required height | Pass | ||
| 23 | 18 | Midrails and toeboards installed | Pass | |||
| 24 | 19 | End guardrails and toeboards at the scaffold ends | Pass | |||
| 25 | 20 | Advance guardrail parts (if used) installed correctly | Pass | |||
| 26 | 21 | Openings and access points covered or guarded | Pass | |||
| 27 | 22 | Access and walkways | Stairs and ladders secured | Pass | ||
| 28 | 23 | Guardrails around the access opening | Pass | |||
| 29 | 24 | Walkways clear of obstructions and protruding objects | Pass | |||
| 30 | 25 | Lighting is adequate | Pass | |||
| 31 | 26 | Workers do not climb cross braces to get on or off | Pass | |||
| 32 | 27 | Falling objects, loads, and other | Debris netting and catch platforms secured | Pass | ||
| 33 | 28 | Toeboards and netting have no tears or loose sections | Pass | |||
| 34 | 29 | Ramps and walkways: slope and cleats are adequate | Pass | |||
| 35 | 30 | Maximum intended load posted or known to users | Pass | |||
| 36 | 31 | Overhead power lines: clearance kept or lines guarded | Pass | |||
| 37 | 32 | Scaffold status tag (for example green / yellow / red) in place and up to date | Pass | |||
| 38 | 33 | |||||
| 39 | 34 | |||||
| 40 | 35 | |||||
| 41 | ||||||
| 42 | Defect record (fill in every time you mark a defect. Fill left to right in the order things happened. "Condition found" is written by the person who found it, "Corrective action" by the person who fixed it, "Verified by" by the person who checked it.) | |||||
| 43 | Date / condition found | Stopped? / reported to / action | Verified by / returned to service | |||
| 44 | 8/5 East side, level 1: one sweeper tube clamp loose | Area closed. Told the foreman at 7:15. Clamp tightened at 7:30 | J. Davis, 8/5 7:40 | |||
| 45 | ||||||
| 46 | ||||||
| 47 | ||||||
| 48 | Summary (what must be done before the next inspection, due date, person responsible) | |||||
| 49 | Loose sweeper tube clamp fixed. Extra inspection after the high wind forecast for 8/9. Competent person: J. Davis. | |||||
| 50 | ||||||
| 51 | ||||||
| 52 | Inspected by | Reviewed by (supervisor) | Approved by (manager) | |||
| 53 | ||||||
| 54 | ||||||
| 55 | Notice: This is a general-purpose inspection record. It is not an official government form and does not by itself show compliance with OSHA or any other regulation or standard. | |||||
| 56 | Related regulations and standards (for reference): OSHA 29 CFR 1926.451(f)(3): scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity. Check the current rule and the scaffold manufacturer's instructions. | |||||
| 57 | Which inspections you need, how often, and how long to keep records depend on your equipment, industry, and location. Check the regulations that apply to you, the manufacturer's instructions, and a qualified person. | |||||
| 58 | Worker Library accepts no liability for any loss arising from the use of this template. Regulations change; check the source page for the latest version. | |||||
| 59 | Worker Library https://worker-library.com/templates/scaffold-inspection-checklist/ Updated 2026-10-21 | |||||
| A | B | C | D | E | F | |
|---|---|---|---|---|---|---|
| 1 | Scaffold Inspection Checklist (Before Each Shift and After Changes) [SAMPLE] | |||||
| 2 | Site | Site 4, Building B | Scaffold ID | |||
| 3 | Inspection type | After assembly | Date | 09/08/2026 | ||
| 4 | Platform height / base | 15 ft / 4 ft 3 in | Inspected by | J. Davis | ||
| 5 | ||||||
| 6 | No. | Area | Inspection item | What to look for | Method | Result |
| 7 | 1. Height and stability (tip-over risk: do not use until these are right) | |||||
| 8 | 1 | Stability | Platform height and base width are within the limit | Within the manufacturer's height-to-base limit. If not, add outriggers, ties, or guys as the manufacturer specifies | Measure | Pass |
| 9 | 2 | Outriggers (if used) are the right size | Outrigger height not less than its width, or as the manufacturer specifies | Visual / measure | Pass | |
| 10 | 3 | Outriggers have a jack where the diagonal and horizontal members meet | Jack in place and adjusted to the floor | Visual | Pass | |
| 11 | 4 | Tall towers have an intermediate horizontal frame | Horizontal frame between the casters and the platform when the tower is tall for its base (per manufacturer) | Visual | Pass | |
| 12 | 2. Platform | |||||
| 13 | 5 | Platform | Platform deck has uplift-preventing hooks at all four corners | Hooks at all four corners, engaged | Visual | Pass |
| 14 | 6 | Planks (if used) are laid tight and secured | Full width, no wide gaps, secured to the supports | Visual | Pass | |
| 15 | 7 | Platform has no damage, deformation, or kick-up | Do not use damaged or deformed parts | Visual | Pass | |
| 16 | 3. Frames and bracing | |||||
| 17 | 8 | Frames | Frame coupling pins are inserted far enough | Coupling pins fully inserted with locks engaged (length per manufacturer) | Visual / hand | Pass |
| 18 | 9 | Cross brace pins are the right size and lock | Brace pins with locks, size per manufacturer | Visual | Pass | |
| 19 | 10 | Horizontal bracing or ties at the bottom of the tower | Horizontal cross bracing or ties at the base | Visual | Pass | |
| 20 | 11 | Ties have clamps at both ends | Clamps at both ends grip firmly | Visual / hand | Pass | |
| 21 | 12 | Horizontal frames have uplift-preventing hooks at both ends | Hooks engaged at both ends | Visual | Pass | |
| 22 | 4. Casters | |||||
| 23 | 13 | Casters | Casters are the right size | Caster size and rating per manufacturer for the load | Visual | Pass |
| 24 | 14 | Caster brakes are fitted and hold | Each brake locks the wheel; the tower does not move when pushed | Operate | Fail | |
| 25 | 15 | Caster stems cannot come out of the legs | Stem locked to the leg, does not pull out | Visual / hand | Pass | |
| 26 | 5. Access and guardrails | |||||
| 27 | 16 | Access / guards | [Ladder] Rungs are the right length and evenly spaced | Built-in or attached ladder per manufacturer; rungs evenly spaced | Visual | Pass |
| 28 | 17 | [Stairs] Slope and width are adequate | Per manufacturer | Visual | Pass | |
| 29 | 18 | Guardrails, midrails, and toeboards around the platform | Top rail and midrail on all open sides; toeboards where tools or materials could fall | Visual | Pass | |
| 30 | 6. Use | |||||
| 31 | 19 | Use | Maximum load is set and posted | Rated load per manufacturer, posted where users can see it | Visual | Pass |
| 32 | 20 | Frame joints are locked so they cannot separate in use | All joints locked | Visual / hand | Pass | |
| 33 | 21 | Two or more towers are joined securely | Joined with tube and clamps or the manufacturer's parts | Visual | Pass | |
| 34 | 22 | Caster brakes are set and checked | Brakes on at all times except while moving. Check that they hold | Operate | Pass | |
| 35 | 23 | Platform is level on uneven or sloped floors | Leveled with screw jacks | Visual / level | Pass | |
| 36 | 24 | Outriggers set: mounting and floor contact OK | Secure, in full contact with the floor | Visual | Pass | |
| 37 | 25 | Ties or guys used when tarps or sheeting could catch wind | Ties or guys installed | Visual | Pass | |
| 38 | 26 | Not set up near overhead power lines, or lines guarded | Lines moved or covered, or clearance kept | Visual | Pass | |
| 39 | 27 | Load is not over the maximum and not off-center | Within the rated load; materials placed so the tower does not tip | Visual | Pass | |
| 40 | 28 | No ladders or stepladders used on the platform | Do not use ladders on the platform | Visual | Pass | |
| 41 | 29 | Guardrails removed for work or access are put back | Put back as soon as they are no longer needed | Visual | Pass | |
| 42 | 7. Moving the tower (check each time it is moved) | |||||
| 43 | 30 | Moving | Floor checked for bumps, holes, and obstacles before moving | Route checked first | Visual | Pass |
| 44 | 31 | All caster brakes released before moving | All brakes released | Operate | Pass | |
| 45 | 32 | No one on the scaffold while it is moved | Never move it with people on it | Visual | Pass | |
| 46 | 33 | Area around the move kept clear | Only the crew moving it in the area | Visual | Pass | |
| 47 | 34 | All outrigger jacks raised before moving | All jacks raised | Visual | Pass | |
| 48 | 35 | Tower lowered first if it could tip | Reduce the height so it cannot tip | Visual | Pass | |
| 49 | 36 | Outriggers removed or folded if they could hit the building or equipment | Removed or folded | Visual | Pass | |
| 50 | 37 | Towers that were tied: tip-over prevented when moving | Lower the tower or remove sheeting before moving | Visual | Pass | |
| 51 | 38 | |||||
| 52 | 39 | |||||
| 53 | 40 | |||||
| 54 | 41 | |||||
| 55 | ||||||
| 56 | Inspected by (name) | Competent person / foreman | Reviewed by | |||
| 57 | J. Davis | R. Lopez (foreman) | K. Brown (general contractor) | |||
| 58 | ||||||
| 59 | Summary (items not corrected on the spot, work areas stopped, what to check next) | |||||
| 60 | One caster replaced. Platform height 15 ft is above the manufacturer's height limit for this base without outriggers, so outriggers were added before use. | |||||
| 61 | ||||||
| 62 | ||||||
| 63 | ||||||
| 64 | Notice: This is a general-purpose inspection record. It is not an official government form and does not by itself show compliance with OSHA or any other regulation or standard. | |||||
| 65 | Related regulations and standards (for reference): OSHA 29 CFR 1926.451(f)(3): scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity. Check the current rule and the scaffold manufacturer's instructions. | |||||
| 66 | Which inspections you need, how often, and how long to keep records depend on your equipment, industry, and location. Check the regulations that apply to you, the manufacturer's instructions, and a qualified person. | |||||
| 67 | Worker Library accepts no liability for any loss arising from the use of this template. Regulations change; check the source page for the latest version. | |||||
| 68 | Worker Library https://worker-library.com/templates/scaffold-inspection-checklist/ Updated 2026-10-21 | |||||
This preview shows the first 6 of 8 columns. The downloaded file contains everything.
| A | B | C | D | E | F | |
|---|---|---|---|---|---|---|
| 1 | Scaffold Inspection Checklist (Before Each Shift and After Changes) [SAMPLE] | |||||
| 2 | Site | Site 4, Building B | Scaffold | |||
| 3 | Inspection type | After storm (high wind) | Date | 09/08/2026 | ||
| 4 | Competent person | J. Davis | Maximum load | 50 psf (light duty) | ||
| 5 | ||||||
| 6 | No. | Area | Inspection item | What to look for | Method | Result |
| 7 | 1. Before each work shift | |||||
| 8 | 1 | Before shift | Guardrails, midrails, toeboards, and cross braces at the work area: none removed or fallen | All in place | Visual | Pass |
| 9 | 2 | A competent person is assigned to inspect | Name written in the header | Record | Pass | |
| 10 | 2. After erection, a change, a storm, or an earthquake | |||||
| 11 | 3 | After events | Platforms: damage, fastening, and bearing | Full width planked, no wide gaps, planks rest on and are secured to at least two supports | Visual | Pass |
| 12 | 4 | Wedge connections at posts, ledgers, and bearers: not loose | Wedges driven to the set position, not lifting; locking pins in | Visual / hammer | Pass | |
| 13 | 5 | Wedges and rosettes (or cups): damage and corrosion | No bent, cracked, crushed, or heavily corroded parts | Visual | Pass | |
| 14 | 6 | Guardrails and midrails: removed or fallen | Top rail and midrail at the heights in the manufacturer's manual and the rules that apply | Visual / measure | Fail | |
| 15 | 7 | Toeboards: installed, none removed | Toeboard, debris net, or equal protection in place | Visual | Pass | |
| 16 | 8 | Legs: settling or sliding | Base plates on mudsills; base ties installed | Visual | Pass | |
| 17 | 9 | Braces, ties, and wall ties: installed, none removed | Tie spacing per the manufacturer's manual and the erection drawing | Visual | Pass | |
| 18 | 10 | Posts, ledgers, and bearers: damage | Remove bent, dented, cracked, or heavily corroded members | Visual | Pass | |
| 19 | 11 | Suspended scaffold parts (if used with it): outrigger beams, ropes, and hoist pawls | Only if a suspended scaffold is used with it. Otherwise mark N/A | Visual / operate | Pass | |
| 20 | 3. Records | |||||
| 21 | 12 | Records | Inspection result and the inspector's name written down | This sheet is the record. Always write the name | Record | Pass |
| 22 | 13 | Corrective action written down | Write what was fixed and how, not just "fixed" | Record | Pass | |
| 23 | 14 | Records kept until the job ends | Keep with the job file for the length of the job (company practice) | Record | Pass | |
| 24 | 4. System scaffold items | |||||
| 25 | 15 | System | Wedges fully driven | Wedge head at the set position. Check by hand | Visual / hand | Pass |
| 26 | 16 | Post connections have locking pins | All locking pins required by the manufacturer in place | Visual | Pass | |
| 27 | 17 | No mixing of brands or connection systems | Different systems do not fit. Do not mix | Visual | Pass | |
| 28 | 18 | Advance guardrail parts used in the right order during erection and dismantling | Follow the manufacturer's erection sequence | Visual | Pass | |
| 29 | 19 | Stairs or ladders secured; access openings guarded | Hatch or gate at the access opening works | Visual | Pass | |
| 30 | 20 | Maximum load set, posted, and known to workers | Rated load per manufacturer, posted where users can see it | Visual | Pass | |
| 31 | 21 | Overhead power lines: guarded or clear | Lines moved or covered, or clearance kept | Visual | Pass | |
| 32 | 22 | Erection crew led by a competent person | Checks materials, tools, and PPE, sets the work method, and watches the work | Record | Pass | |
| 33 | 23 | |||||
| 34 | 24 | |||||
| 35 | 25 | |||||
| 36 | 26 | |||||
| 37 | ||||||
| 38 | Inspected by (name) | Competent person / foreman | Reviewed by | |||
| 39 | J. Davis | R. Lopez (foreman) | K. Brown (general contractor) | |||
| 40 | ||||||
| 41 | Summary (items not corrected on the spot, work areas stopped, what to check next) | |||||
| 42 | Inspection after last night's high wind (gusts of 47 mph). One fallen guardrail put back. Keep this record with the job file until the job ends. | |||||
| 43 | ||||||
| 44 | ||||||
| 45 | ||||||
| 46 | Notice: This is a general-purpose inspection record. It is not an official government form and does not by itself show compliance with OSHA or any other regulation or standard. | |||||
| 47 | Related regulations and standards (for reference): OSHA 29 CFR 1926.451(f)(3): scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity. Check the current rule and the scaffold manufacturer's instructions. | |||||
| 48 | Which inspections you need, how often, and how long to keep records depend on your equipment, industry, and location. Check the regulations that apply to you, the manufacturer's instructions, and a qualified person. | |||||
| 49 | Worker Library accepts no liability for any loss arising from the use of this template. Regulations change; check the source page for the latest version. | |||||
| 50 | Worker Library https://worker-library.com/templates/scaffold-inspection-checklist/ Updated 2026-10-21 | |||||
This preview shows the first 6 of 8 columns. The downloaded file contains everything.
| A | B | C | D | E | F | |
|---|---|---|---|---|---|---|
| 1 | Scaffold Inspection Checklist (Before Each Shift and After Changes) | |||||
| 2 | Site | Date | ||||
| 3 | Inspection type | Competent person | ||||
| 4 | ||||||
| 5 | No. | Area | Inspection item | Inspection type | Result | Defect found / corrective action |
| 6 | 1 | Foundation and base | Mudsills and base plates firmly set, with no settling or gaps | |||
| 7 | 2 | Screw jacks and legs are not sliding or shifting | ||||
| 8 | 3 | Base ties (sweeper tubes) installed securely | ||||
| 9 | 4 | Ground has no washout or soft spots | ||||
| 10 | 5 | Connections | Post (leg) joints connected securely | |||
| 11 | 6 | Clamps and couplers are not loose or damaged | ||||
| 12 | 7 | Ledger and bearer connections have no play | ||||
| 13 | 8 | Wedges and pins fully inserted | ||||
| 14 | 9 | Ties and bracing | Wall ties installed at the required spacing | |||
| 15 | 10 | Wall ties undamaged, none removed | ||||
| 16 | 11 | Cross braces and diagonal braces installed | ||||
| 17 | 12 | Tie anchor points on the building are not loose or broken | ||||
| 18 | 13 | Platforms | Platforms fully planked; width and gaps within the scaffold's requirements | |||
| 19 | 14 | Planks secured so they cannot kick up or slide | ||||
| 20 | 15 | Planks have no damage or major deflection | ||||
| 21 | 16 | No unneeded materials or tools left on platforms | ||||
| 22 | 17 | Fall protection | Top rails installed on all open sides at the required height | |||
| 23 | 18 | Midrails and toeboards installed | ||||
| 24 | 19 | End guardrails and toeboards at the scaffold ends | ||||
| 25 | 20 | Advance guardrail parts (if used) installed correctly | ||||
| 26 | 21 | Openings and access points covered or guarded | ||||
| 27 | 22 | Access and walkways | Stairs and ladders secured | |||
| 28 | 23 | Guardrails around the access opening | ||||
| 29 | 24 | Walkways clear of obstructions and protruding objects | ||||
| 30 | 25 | Lighting is adequate | ||||
| 31 | 26 | Workers do not climb cross braces to get on or off | ||||
| 32 | 27 | Falling objects, loads, and other | Debris netting and catch platforms secured | |||
| 33 | 28 | Toeboards and netting have no tears or loose sections | ||||
| 34 | 29 | Ramps and walkways: slope and cleats are adequate | ||||
| 35 | 30 | Maximum intended load posted or known to users | ||||
| 36 | 31 | Overhead power lines: clearance kept or lines guarded | ||||
| 37 | 32 | Scaffold status tag (for example green / yellow / red) in place and up to date | ||||
| 38 | 33 | |||||
| 39 | 34 | |||||
| 40 | 35 | |||||
| 41 | ||||||
| 42 | Defect record (fill in every time you mark a defect. Fill left to right in the order things happened. "Condition found" is written by the person who found it, "Corrective action" by the person who fixed it, "Verified by" by the person who checked it.) | |||||
| 43 | Date / condition found | Stopped? / reported to / action | Verified by / returned to service | |||
| 44 | ||||||
| 45 | ||||||
| 46 | ||||||
| 47 | ||||||
| 48 | Summary (what must be done before the next inspection, due date, person responsible) | |||||
| 49 | ||||||
| 50 | ||||||
| 51 | ||||||
| 52 | Inspected by | Reviewed by (supervisor) | Approved by (manager) | |||
| 53 | ||||||
| 54 | ||||||
| 55 | Notice: This is a general-purpose inspection record. It is not an official government form and does not by itself show compliance with OSHA or any other regulation or standard. | |||||
| 56 | Related regulations and standards (for reference): OSHA 29 CFR 1926.451(f)(3): scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity. Check the current rule and the scaffold manufacturer's instructions. | |||||
| 57 | Which inspections you need, how often, and how long to keep records depend on your equipment, industry, and location. Check the regulations that apply to you, the manufacturer's instructions, and a qualified person. | |||||
| 58 | Worker Library accepts no liability for any loss arising from the use of this template. Regulations change; check the source page for the latest version. | |||||
| 59 | Worker Library https://worker-library.com/templates/scaffold-inspection-checklist/ Updated 2026-10-21 | |||||
| A | B | C | D | E | F | |
|---|---|---|---|---|---|---|
| 1 | Scaffold Inspection Checklist (Before Each Shift and After Changes) | |||||
| 2 | Site | Scaffold ID | ||||
| 3 | Inspection type | Date | ||||
| 4 | Platform height / base | Inspected by | ||||
| 5 | ||||||
| 6 | No. | Area | Inspection item | What to look for | Method | Result |
| 7 | 1. Height and stability (tip-over risk: do not use until these are right) | |||||
| 8 | 1 | Stability | Platform height and base width are within the limit | Within the manufacturer's height-to-base limit. If not, add outriggers, ties, or guys as the manufacturer specifies | Measure | |
| 9 | 2 | Outriggers (if used) are the right size | Outrigger height not less than its width, or as the manufacturer specifies | Visual / measure | ||
| 10 | 3 | Outriggers have a jack where the diagonal and horizontal members meet | Jack in place and adjusted to the floor | Visual | ||
| 11 | 4 | Tall towers have an intermediate horizontal frame | Horizontal frame between the casters and the platform when the tower is tall for its base (per manufacturer) | Visual | ||
| 12 | 2. Platform | |||||
| 13 | 5 | Platform | Platform deck has uplift-preventing hooks at all four corners | Hooks at all four corners, engaged | Visual | |
| 14 | 6 | Planks (if used) are laid tight and secured | Full width, no wide gaps, secured to the supports | Visual | ||
| 15 | 7 | Platform has no damage, deformation, or kick-up | Do not use damaged or deformed parts | Visual | ||
| 16 | 3. Frames and bracing | |||||
| 17 | 8 | Frames | Frame coupling pins are inserted far enough | Coupling pins fully inserted with locks engaged (length per manufacturer) | Visual / hand | |
| 18 | 9 | Cross brace pins are the right size and lock | Brace pins with locks, size per manufacturer | Visual | ||
| 19 | 10 | Horizontal bracing or ties at the bottom of the tower | Horizontal cross bracing or ties at the base | Visual | ||
| 20 | 11 | Ties have clamps at both ends | Clamps at both ends grip firmly | Visual / hand | ||
| 21 | 12 | Horizontal frames have uplift-preventing hooks at both ends | Hooks engaged at both ends | Visual | ||
| 22 | 4. Casters | |||||
| 23 | 13 | Casters | Casters are the right size | Caster size and rating per manufacturer for the load | Visual | |
| 24 | 14 | Caster brakes are fitted and hold | Each brake locks the wheel; the tower does not move when pushed | Operate | ||
| 25 | 15 | Caster stems cannot come out of the legs | Stem locked to the leg, does not pull out | Visual / hand | ||
| 26 | 5. Access and guardrails | |||||
| 27 | 16 | Access / guards | [Ladder] Rungs are the right length and evenly spaced | Built-in or attached ladder per manufacturer; rungs evenly spaced | Visual | |
| 28 | 17 | [Stairs] Slope and width are adequate | Per manufacturer | Visual | ||
| 29 | 18 | Guardrails, midrails, and toeboards around the platform | Top rail and midrail on all open sides; toeboards where tools or materials could fall | Visual | ||
| 30 | 6. Use | |||||
| 31 | 19 | Use | Maximum load is set and posted | Rated load per manufacturer, posted where users can see it | Visual | |
| 32 | 20 | Frame joints are locked so they cannot separate in use | All joints locked | Visual / hand | ||
| 33 | 21 | Two or more towers are joined securely | Joined with tube and clamps or the manufacturer's parts | Visual | ||
| 34 | 22 | Caster brakes are set and checked | Brakes on at all times except while moving. Check that they hold | Operate | ||
| 35 | 23 | Platform is level on uneven or sloped floors | Leveled with screw jacks | Visual / level | ||
| 36 | 24 | Outriggers set: mounting and floor contact OK | Secure, in full contact with the floor | Visual | ||
| 37 | 25 | Ties or guys used when tarps or sheeting could catch wind | Ties or guys installed | Visual | ||
| 38 | 26 | Not set up near overhead power lines, or lines guarded | Lines moved or covered, or clearance kept | Visual | ||
| 39 | 27 | Load is not over the maximum and not off-center | Within the rated load; materials placed so the tower does not tip | Visual | ||
| 40 | 28 | No ladders or stepladders used on the platform | Do not use ladders on the platform | Visual | ||
| 41 | 29 | Guardrails removed for work or access are put back | Put back as soon as they are no longer needed | Visual | ||
| 42 | 7. Moving the tower (check each time it is moved) | |||||
| 43 | 30 | Moving | Floor checked for bumps, holes, and obstacles before moving | Route checked first | Visual | |
| 44 | 31 | All caster brakes released before moving | All brakes released | Operate | ||
| 45 | 32 | No one on the scaffold while it is moved | Never move it with people on it | Visual | ||
| 46 | 33 | Area around the move kept clear | Only the crew moving it in the area | Visual | ||
| 47 | 34 | All outrigger jacks raised before moving | All jacks raised | Visual | ||
| 48 | 35 | Tower lowered first if it could tip | Reduce the height so it cannot tip | Visual | ||
| 49 | 36 | Outriggers removed or folded if they could hit the building or equipment | Removed or folded | Visual | ||
| 50 | 37 | Towers that were tied: tip-over prevented when moving | Lower the tower or remove sheeting before moving | Visual | ||
| 51 | 38 | |||||
| 52 | 39 | |||||
| 53 | 40 | |||||
| 54 | 41 | |||||
| 55 | ||||||
| 56 | Inspected by (name) | Competent person / foreman | Reviewed by | |||
| 57 | ||||||
| 58 | ||||||
| 59 | Summary (items not corrected on the spot, work areas stopped, what to check next) | |||||
| 60 | ||||||
| 61 | ||||||
| 62 | ||||||
| 63 | ||||||
| 64 | Notice: This is a general-purpose inspection record. It is not an official government form and does not by itself show compliance with OSHA or any other regulation or standard. | |||||
| 65 | Related regulations and standards (for reference): OSHA 29 CFR 1926.451(f)(3): scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity. Check the current rule and the scaffold manufacturer's instructions. | |||||
| 66 | Which inspections you need, how often, and how long to keep records depend on your equipment, industry, and location. Check the regulations that apply to you, the manufacturer's instructions, and a qualified person. | |||||
| 67 | Worker Library accepts no liability for any loss arising from the use of this template. Regulations change; check the source page for the latest version. | |||||
| 68 | Worker Library https://worker-library.com/templates/scaffold-inspection-checklist/ Updated 2026-10-21 | |||||
This preview shows the first 6 of 8 columns. The downloaded file contains everything.
| A | B | C | D | E | F | |
|---|---|---|---|---|---|---|
| 1 | Scaffold Inspection Checklist (Before Each Shift and After Changes) | |||||
| 2 | Site | Scaffold | ||||
| 3 | Inspection type | Date | ||||
| 4 | Competent person | Maximum load | ||||
| 5 | ||||||
| 6 | No. | Area | Inspection item | What to look for | Method | Result |
| 7 | 1. Before each work shift | |||||
| 8 | 1 | Before shift | Guardrails, midrails, toeboards, and cross braces at the work area: none removed or fallen | All in place | Visual | |
| 9 | 2 | A competent person is assigned to inspect | Name written in the header | Record | ||
| 10 | 2. After erection, a change, a storm, or an earthquake | |||||
| 11 | 3 | After events | Platforms: damage, fastening, and bearing | Full width planked, no wide gaps, planks rest on and are secured to at least two supports | Visual | |
| 12 | 4 | Wedge connections at posts, ledgers, and bearers: not loose | Wedges driven to the set position, not lifting; locking pins in | Visual / hammer | ||
| 13 | 5 | Wedges and rosettes (or cups): damage and corrosion | No bent, cracked, crushed, or heavily corroded parts | Visual | ||
| 14 | 6 | Guardrails and midrails: removed or fallen | Top rail and midrail at the heights in the manufacturer's manual and the rules that apply | Visual / measure | ||
| 15 | 7 | Toeboards: installed, none removed | Toeboard, debris net, or equal protection in place | Visual | ||
| 16 | 8 | Legs: settling or sliding | Base plates on mudsills; base ties installed | Visual | ||
| 17 | 9 | Braces, ties, and wall ties: installed, none removed | Tie spacing per the manufacturer's manual and the erection drawing | Visual | ||
| 18 | 10 | Posts, ledgers, and bearers: damage | Remove bent, dented, cracked, or heavily corroded members | Visual | ||
| 19 | 11 | Suspended scaffold parts (if used with it): outrigger beams, ropes, and hoist pawls | Only if a suspended scaffold is used with it. Otherwise mark N/A | Visual / operate | ||
| 20 | 3. Records | |||||
| 21 | 12 | Records | Inspection result and the inspector's name written down | This sheet is the record. Always write the name | Record | |
| 22 | 13 | Corrective action written down | Write what was fixed and how, not just "fixed" | Record | ||
| 23 | 14 | Records kept until the job ends | Keep with the job file for the length of the job (company practice) | Record | ||
| 24 | 4. System scaffold items | |||||
| 25 | 15 | System | Wedges fully driven | Wedge head at the set position. Check by hand | Visual / hand | |
| 26 | 16 | Post connections have locking pins | All locking pins required by the manufacturer in place | Visual | ||
| 27 | 17 | No mixing of brands or connection systems | Different systems do not fit. Do not mix | Visual | ||
| 28 | 18 | Advance guardrail parts used in the right order during erection and dismantling | Follow the manufacturer's erection sequence | Visual | ||
| 29 | 19 | Stairs or ladders secured; access openings guarded | Hatch or gate at the access opening works | Visual | ||
| 30 | 20 | Maximum load set, posted, and known to workers | Rated load per manufacturer, posted where users can see it | Visual | ||
| 31 | 21 | Overhead power lines: guarded or clear | Lines moved or covered, or clearance kept | Visual | ||
| 32 | 22 | Erection crew led by a competent person | Checks materials, tools, and PPE, sets the work method, and watches the work | Record | ||
| 33 | 23 | |||||
| 34 | 24 | |||||
| 35 | 25 | |||||
| 36 | 26 | |||||
| 37 | ||||||
| 38 | Inspected by (name) | Competent person / foreman | Reviewed by | |||
| 39 | ||||||
| 40 | ||||||
| 41 | Summary (items not corrected on the spot, work areas stopped, what to check next) | |||||
| 42 | ||||||
| 43 | ||||||
| 44 | ||||||
| 45 | ||||||
| 46 | Notice: This is a general-purpose inspection record. It is not an official government form and does not by itself show compliance with OSHA or any other regulation or standard. | |||||
| 47 | Related regulations and standards (for reference): OSHA 29 CFR 1926.451(f)(3): scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity. Check the current rule and the scaffold manufacturer's instructions. | |||||
| 48 | Which inspections you need, how often, and how long to keep records depend on your equipment, industry, and location. Check the regulations that apply to you, the manufacturer's instructions, and a qualified person. | |||||
| 49 | Worker Library accepts no liability for any loss arising from the use of this template. Regulations change; check the source page for the latest version. | |||||
| 50 | Worker Library https://worker-library.com/templates/scaffold-inspection-checklist/ Updated 2026-10-21 | |||||
This preview shows the first 6 of 8 columns. The downloaded file contains everything.
Cells marked ▼ have a drop-down list. Lightly shaded rows are where you write.
File details
| Format | Excel (.xlsx) |
|---|---|
| Works with | Microsoft Excel 2016 or later, Excel for Microsoft 365, Google Sheets, LibreOffice Calc |
| Paper | Print areas set for US Letter |
| Sheets | Instructions / Scaffold Inspection / Rolling Scaffold / System Scaffold / Sample - Scaffold / Sample - Rolling / Sample - System / Print - Scaffold / Print - Rolling / Print - System |
| Macros | None |
| File size | About 40 KB |
| Updated | 2026-10-21 |
How to use the scaffold inspection checklist
- Fill in the site, date, inspection type, and the competent person's name.
- Walk the scaffold from the base up and mark Pass, Fail, or N/A on each line.
- If any line is Fail, close that part of the scaffold, put a "Do Not Use" tag on it, and write the defect and fix in the defect record.
- Before the scaffold is used again, the competent person checks the fix and signs the re-check.
- Keep each sheet with the job file. Start a new sheet for every inspection.
Adapting it to your site
- Delete lines that do not apply, such as suspended scaffold parts or debris netting.
- Add lines from the scaffold manufacturer's manual, such as bracket loads, hoist arms, or a specific tie pattern.
- If you use a green / yellow / red tag system, write the tag color in the summary.
Before you use it
- OSHA 29 CFR 1926.451(f)(3) asks for scaffolds and components to be inspected for visible defects by a competent person before each work shift and after any occurrence that could affect structural integrity. This template is a way to record that; it is not an official form.
- Heights, spacing, and load limits differ by scaffold type. Follow the manufacturer's manual and erection drawing, and the rules that apply to your scaffold.
- Do not use a scaffold with a Fail line until it is fixed and the competent person has checked it again.
- State plans may add requirements. Check the current rules that apply to your site.
- This template is provided as-is for reference. Worker Library is not liable for any loss arising from its use. Regulations change, so check the update date on this page.
Scaffold Inspection Checklist FAQ
How often does a scaffold need to be inspected?
OSHA 29 CFR 1926.451(f)(3) says scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect structural integrity.
Who can inspect a scaffold?
Under 29 CFR 1926.451(f)(3), the inspection is done by a competent person. Write that person's name in the header of each sheet.
Do I need to keep scaffold inspection records?
The rule above asks for the inspection; it does not set a form. Many contractors keep a written record for each inspection with the job file until the job ends. Check your company policy and the general contractor's requirements.
Does this checklist work for rolling scaffolds?
Yes. The Rolling Scaffold sheet has 37 items for scaffold towers on casters, including caster brakes, outriggers, and what to check each time the tower is moved.